ELECTRICAL


SUBSTATION & INSTRUMENTATION PROJECT - CHP

Electrical. Instrumentation & Automation:

POWER MAX (INDIA) PVT LTD. provides dedicated services in engineering, erection and installation of electrical equipments, instrumentation and control equipments to various power and other industries.

  • Erection of Substations.
  • Erection of Indoor Substation upto 33 KV.
  • Laying & joining of underground Cables upto 220 KV.
  • Installation & Commissioning of HV & LV Plants & Equipments like Generators, Transformers, Motors, Lighting Panels, Distribution Boards etc.
  • Lighting Installation in Factories Auditoriums, Sports Complexes, Office/Residential Buildings, Stock Yards, Roads & Streets etc.
  • Repairing, Overhauling, Maintenance & Testing of Transformers, Motors. Switchgears and Distribution Plants & Equipments.
  • Testing & Overhauling of Protective Relays in Power Houses, Substations, Transmission & Distribution Systems as well as Industrial Plants.

Client : M/s Hindalco - Muri


POWER MAX (INDIA) PVT LTD. has completed the Substation Project for Coal Handling Systems at Hindalco Industries, the Turnkey Installation of 6.6 KV Switchyard for Captive Power Plant at Muri Works.

System Description :

Design Engineering, Supply, Erection, Testing and Commissioning of 6.6 KV Switchyard Control Panels, HT and LT Switchboards, Motor Control Center, PLCs, Control System of Wagon Tippler, Station Earthing including Lightning Protection, all Drives related to Conveyors, Crusher House Plant Illumination and Electricals of Dust Suppression and Extraction System.

Major Equipments involved :

HT & LT Switch Gears, PLC, MCC, Transformers etc. Electrical, Drives and Control System related to Wagon Tippler, Apron Feeder, Primary & Secondary Crushers, Dust Extraction, Ventilation & Dust Suppression System.

ELECTRICAL & INSTRUMENTATION PROJECT - IOCL

Client : M/s Indian Oil Corporation LTD

POWER MAX (INDIA) PVT LTD. has completed project at IOCL, Panipath Refineries involving total Electrical and Instrumentation works.

Brief System Description :

Erection, Testing and Commissioning of 6.6 KV Switchboard involving Testing and Commissioning of Transformers, PLCs and High HP Motors, Plant Illumination including Luminaries and Earthing System.


Major Equipments Involved in the above Switchyard :

6.6 KV, 10 MVA Transformer, 6.6 KV Switchboard, PLC and various types of High HP Motors.

Associated Work of Civil, Structural, and other disciplines consists of :

Foundation of various Electrical Equipments, Cable Trenches, Lighting Accessories for Instrumentation Cables, Piping Work.


ELECTRICAL PROJECT – M/s SAIL - KIOM

Client : M/s Steel Authority of India LTD

POWER MAX (INDIA) PVT LTD. has completed the Turnkey Project for up gradation of Material Handling Plant for SAIL. at Kiriburu Iron Ore Mines, Kiriburu. Jharkhand. This project involves Supply, Erection, Testing and Commissioning of 400 KW, HT Slip Ring Induction Motor.

System Description :

The Electrical package involves Design. Supply, Erection, Testing and Commissioning of Electrical items like 400 Kw, HT Slip Ring Induction Motor, total Plant Illumination. Safety Switches and Earthing System.

Major Equipments involved in the above Iron Ore Handling Plant

400 KW HT Slip Ring Motor along with its Accessories. 1.5 Km long Belt Conveyor System complete with Safety Switches like Belt Sway, Zero Speed Switches and Pull - Cord Switches. Drive House Electricals including items for Earthing.



Client : M/s Steel Authority of India LTD - MIOM

POWER MAX (INDIA) PVT LTD. is undertaking the EPC Project for upgradation of Material Handling Plant for SAIL, at Meghahatuburu Iron Ore Mines, Meghahatuburu, Jharkhand.

System Description:

Total Electrical, Instrumentation and Automation work to upgrade and enhance the capacity of existing Ore Handling System to 6.5 MTPA. Electrical Work
Erection and Installation. Modification/Rectification in 3.3KV Vacuum Contactor Panels, Extension of Existing 3.3KV 400 amp VC Board. VFD, UPS. LDB, Modification and Retrofitting in the Panels of Existing MCC of Loading Station. Capacitor Bank Panel for HT Motor, Modification in 3.3KV MOCB Panels, VCB, Cable Tray Routing and Development of Lighting Distribution Circuit and Illumination of the Plant.


Electrical Structural Expertise :

Erection and Installation of 15 mtrs High Cable Bridge (Railway Line Crossing).

Instrumentation Work :

The scope of work includes Preparation and Developing Drawings considering Loading Bunker Level Measurement and Signaling system for Loading Bunker, Weigh Feeders, Programmable Controller for Air Blaster Cannon System, Load Cells, Special Cables and Conduits in complete and the Fire Detection and Alarm System for different places like Cable Gallery Room, HT, LT, MCC Rooms of OHP Control Room etc.


Client : M/s Vedanta Aluminium LTD — Lanjigarh

POWER MAX (INDIA) PVT LTD. is undertaking the EPC Project for upgradation of Bauxite Handling Plant for Vedanta Aluminium LTD, at Lanjigarh. Orissa on a Turnkey Basis.

System Description :

Total Electrical. Instrumentation and Automation Work for Design, Engineering, Procurement. Supply, Transpodation, Testing, Supervision of Commissioning and Demonstration and Execution of PG Test of Bauxite Handling System using Wagon Tippler for the Alumina Refinery at Lanjigarh, Orissa.

Electrical Work :

The Package includes installation of different items like Transformer, PLC, MIMIC & its UPS. Battery and Battery Charger, ACDB, DCDB, Jointing Kits,Lugs,Glands, Ferruels, safety switches, Welding socket & PBS.

The Package includes installation of different items like Transformer, PLC, MIMIC & its UPS. Battery and Battery Charger. ACDB, DCDB, Jointing Kits, Lugs, Glands. Ferruels, Safety Switches, Welding Socket & PBS.


Client : M/s Steel Authority of India LTD — Bokaro

POWER MAX (INDIA) PVT LTD. is undertaking the EPC Project for upgradation of Coal Handling & Coke Sorting Plant for SAIL at Bokaro Steel Plant. Bokaro, Jharkhand on a Turnkey Basis.

System Description :

Design, Engineering, Manufacture/Procurement. Assembly, Testing and Inspection. Painting, Packaging, Transportation, Supply, Unloading and Storage at Site, Erection, Testing, Trial Run. Commissioning and Stabilization of Associated Electrics and Automation System required for successful operation and control of various Conveyors and all Equipments of Coke Sorting Plant.

Electrical Work :

The Package involves Engineering, Procurement, Construction and replacement of Motors and MCCs in CHP and Coke Crusher along with Power and Control Cables with Illumination, LT Power & Control Cables (Interfacing, Interlocking, Signaling, Annunciation. Metering etc.) of new MCCs/PDBs, PLC System, PC based Engineering Station, Remote I/O Panels, HMI Terminal, 2X10kVA UPS System, Safety Switches, Hooters, Cable Routes, Cable Racks, Junction Boxes, Local Control Station, Illumination of Plant. Replacement of Lighting Distribution Board and Lightning Protection System.


Client : M/s Steel Authority of India LTD — Gua

POWER MAX (INDIA) PVT LTD. has completed the EPC Project for upgradation of Iron Ore Handling Plant for SAIL, at Gua Iron Ore Mines, Gua, Jharkhand on an EPC basis.

System Description :

Design, Engineering, Procurement, Manufacture, Supply, Transportation, Testing and Supervision of Commissioning of Apron Feeder and Hopper in front of Jaw Crusher.

Electrical Work :

The scope involves all Electrical works required for installation of 2 Nos. of Apron Feeders and Hoppers Likely, Circuit Breaker, VFD, PLC/MIMIC/RIO Panels, Safety Switches (PCS, BSW. ZSS), PMCC, MLDB, LDB, Switchgears, VCB, ACB, LT and Control Cables, Junction Box and Push Button, Illumination System, Earthing System etc.