EPC


POWER MAX (INDIA) PVT LTD. is a leading Engineering, Procurement and Construction (EPC) Company rendering turnkey solutions for mega projects in Steel. Power, Coal, Alumina and other Core Sector Industries.

Material handling project for Hindalco Industries Ltd.

POWER MAX (INDIA) PVT LTD. undertakes execution of EPC projects for Coal & Material Handling Plants. It engages in Design. Engineering, Manufacturing/ Procurement. Supply, Packing, Forwarding, Transportation, Handling, Supervision, Erection and Commissioning of Material Handling Systems including all associated work like Civil, Structural, Electrical, Instrumentation, Painting etc. on Turnkey basis.
POWER MAX (INDIA) PVT LTD. had commissioned & completed the project of Coal Handling Systems for Hindalco Industries, on turnkey basis for their Captive Power Plant at Muri Works.


System Description :

The Coal Handling Plant put up by POWER MAX (INDIA) PVT LTD. for Hindalco. Muri comprises of two distinct circuits as detailed hereunder .

Wagon tippler and Raw Coal Stock Pile (Circuit 1)

Raw Coal transported to the plant through wagons are being tippled by a wagon tippler and subsequently fed into a series of conveyors through apron feeders and finally stock piled through moveable trippers. The capacity handled in this stream is 1000 TPH.


Reclaim Hopper, Crushing and Transport to Boiler Bunkers (Circuit - 2)

The raw Coal, stock piled above is dosed through ground reclaim hoppers and conveyed to boiler bunker through two stage crushing, screening and a series of conveyors. The capacity handled in this stream is 140 TPH.


Major Equipments involved in the above Coal Handling Plant

  • Wagon Tippler , Apron Feeder, Primary & Secondary Crushers, Belt Conveyors, Screens & Feeders
  • Dust Extraction, Ventilation and Dust Suppression System .
  • All Electrical comprising of HT & LT Switch Gears, PLC, MCC, Transformers etc.

MATERIAL HANDLING PROJECT FOR VEDANTA ALUMINIUM LTD

POWER MAX (INDIA) PVT LTD. has completed a project at Vedanta Aluminium Ltd., at Lanjigarh. Orissa, for the turnkey installation of Bauxite Handling Systems. The capacity handled in the system is 450 TPH.
Brief System Description : Raw Bauxite Ore transported to the plant through dumpers is tippled by Truck Tippler and subsequently fed into a series of Conveyors through Apron feeder. The raw Bauxite Ore is conveyed to their existing conveyor through single stage crushing and a series of conveyors.


Major Equipments Involved in the above Bauxite Handling Plant :
  • Truck Tippler, Apron Feeder, Heavy Duty Crusher, Belt Conveyors.
  • Suspended Overband Magnetic Separator, Ventilation and Dust Suppression System (Dry Fog).
  • All Electrical Comprising of HT & LT Switch Gears, PLC, MCC, Transformers etc.

Associated Work of Civil. Structural Works consisted of :
  • The approach ramp of 200 Mtrs. to reach up to the tippler point, concrete hopper, tunnel etc.
  • Approach roads by side of the Conveyors.

MATERIAL HANDLING PROJECT FOR SAIL. RMD

POWER MAX (INDIA) PVT LTD. has completed a project for SAIL, at Kiriburu Iron Ore Mines, Kiriburu, Jharkhand, for the turnkey project of upgradation of Material Handling Plant. Capacity of this System is 1500 TPH.

System Description :
Crushed Iron Ore is conveyed through existing belt conveyor and transferred to the loading conveyor. The Iron ore is being loaded to the Wagon by Wagon Loader system.


Major Equipments involved in the above Coal Handling Plant

  • 1.5 Km long Belt Conveying system id 1500 TPH (including supply of Mechanicals).
  • All Electricals Comprising of HT & LT Motors & Switches Gears, PLC, Mcc,Transformers etc.
  • Structural Take up tower for counter weight. Wagon Loading System.

MATERIAL HANDLING PROJECT FOR SAIL

POWER MAX (INDIA) PVT LTD. has undertaken the turnkey project for up-gradation of Material Handling Plant for SAIL, at Gua Ore Mines, Gua, Jharkhand. Capacity of this system is 1200 TPH.

System Description :
Two nos. Apron feeder of capacity 1200 TPH is installed in front of existing Jaw crusher for implementing smooth loading arrangement.


Major Equipments involved in this Iron Ore Handling Project

Apron feeder, EOT Crane of Capacity 15 MT, DE, DS system, Concrete Hopper and associated Civil & Structural work, retaining wall and ramp.

POWER MAX (INDIA) PVT LTD. has undertaken another project at SAIL. Bokaro Steel Plant, Bokaro. Jharkhand. for Coal Handling & Coke Sorting Plant including Associated facilities on Turnkey basis under rebuilding Coke Oven Battery no 1 & 2. The maximum capacity of the system is 500 TPH.

Major Equipments in the Project :
  • Roller Screen (Primary and Secondary) - 200 TPH, Double Rolled Coke Crusher-70 TPH, 200 TPH & 500 TPH Belt Conveyors and Associated facilities, Spare Drive and Belt changing facilities, Belt Weigher.
  • Wharf & Wharf Gate with Mechanization, Associated Civil, Structural & Electrical work.

MATERIAL HANDLING SYSTEM FOR SAIL AT MEGHAHATUBURU. JHARKHAND

System Description :

Upgrading of Loading System for Enhancement of Production Capacity to 6.5 MTPA.
Capacity Handled : Augmentation from 2000 to 3000 TPH Iron Ore.
Major Equipments involved : Belt Weigh Feeder of 3000 TPH Capacity. Air Blaster Cleaning System for Hoppers. 2.5 KM Conveyor Systems along with Associated Accessories, Air Pollution Control Utility System.